The National Construction Code: what builders need to keep up with

Last updated · By BuildersCPD editorial team

The National Construction Code sets the minimum rules for building in Australia. Here is how it works and how to stay current.

Short answer: the National Construction Code (NCC) sets the minimum technical rules for building work in Australia, and each state and territory adopts it into law, sometimes with its own changes and start dates. Builders need to know which edition and variations apply to each job.

How the NCC is organised

VolumeCovers
Volume OneMainly Class 2 to 9 buildings, such as apartments and commercial buildings
Volume TwoClass 1 and 10 buildings, such as houses and sheds
Volume ThreePlumbing and drainage

Meeting the rules

There are two main ways to comply:

  1. Deemed-to-satisfy solutions. Follow the set methods in the code.
  2. Performance solutions. Show another way meets the performance requirements.

Why the edition matters

The edition that applies usually depends on when the building approval was lodged. State variations can also apply. Check before you start each job.

A simple way to keep up

  • Check the ABCB website when a new edition is announced.
  • Read your state's adoption notes. Start dates and variations differ.
  • Focus on what changes your work. Energy efficiency, waterproofing and accessibility are common areas.
  • Talk to your certifier early. It saves rework.

CPD tip

Code changes are one of the most useful CPD topics for builders, because they affect every job.

General information only. Check the ABCB and your state regulator for the rules that apply to you.

Frequently asked questions

Who writes the National Construction Code?

The Australian Building Codes Board, on behalf of the Australian, state and territory governments.

Does every state use the same NCC?

States and territories adopt the NCC into their own laws, sometimes with their own variations and timing.

Related