Handover without headaches: a builder's final checklist
Last updated · By BuildersCPD editorial team
A good handover reduces call-backs and disputes. Here is a checklist for the final weeks of a job.
Short answer: inspect with the owner before handover, fix items quickly, and give them every certificate, warranty and manual they need, while keeping your own records. A clean handover reduces call-backs and disputes.
Four weeks out
- Book final inspections and any certificates you need.
- Chase subcontractors for their compliance certificates.
- Start a defects list from your own walk-through.
Two weeks out
- Walk through with the owner. Agree on a written list of items.
- Set dates to fix each item. And keep them.
- Clean thoroughly. First impressions count.
Handover day
| Give the owner | Keep for yourself |
|---|---|
| Certificates and approvals | Copies of everything |
| Warranties and product manuals | Signed handover form |
| Maintenance guide | Final photos of every room |
| Keys, codes and remotes | Record of what was handed over |
After handover
- Call the owner after a few weeks to check in.
- Respond quickly to any defect reports.
- Keep records for as long as you might be liable.
Why records matter
If a problem appears years later, dated photos, certificates and a signed handover form can show what was done and when.
General information only. Check your contract and state rules.
Frequently asked questions
What documents should a builder give at handover?
Typically certificates, warranties, product manuals, maintenance information and any approvals, as required by the contract and local rules.
How can I reduce defect claims?
Do a thorough pre-handover inspection with the owner and keep records of every stage of work.
Related
- Building in bushfire-prone areas: a builder's guide to BAL ratings Building in a bushfire-prone area changes materials, details and costs. Here is a plain guide to BAL ratings for builders.
- Cash flow for small building businesses: 7 practical habits Many building businesses fail from cash flow, not lack of work. Here are seven habits that keep money moving.
- NSW builders' CPD: the 12-point rule explained NSW licensed builders and swimming pool builders need 12 CPD points a year. Here is how the points work and a simple plan to get there.
- ProCert announces BuildersCPD, opening early 2027 BuildersCPD is a new ProCert Australia brand for licensed builders, opening in the first quarter of 2027 with practical CPD and one clean record.
- Residential building contracts in NSW: a builder's checklist Most building disputes start with the contract. Here is a checklist to help NSW builders get residential contracts right from day one.
- Site safety for builders: SWMS and the basics that matter most Builders have strong legal duties for site safety. Here are the basics, including when a Safe Work Method Statement is needed.