Handover without headaches: a builder's final checklist

Last updated · By BuildersCPD editorial team

A good handover reduces call-backs and disputes. Here is a checklist for the final weeks of a job.

Short answer: inspect with the owner before handover, fix items quickly, and give them every certificate, warranty and manual they need, while keeping your own records. A clean handover reduces call-backs and disputes.

Four weeks out

  • Book final inspections and any certificates you need.
  • Chase subcontractors for their compliance certificates.
  • Start a defects list from your own walk-through.

Two weeks out

  1. Walk through with the owner. Agree on a written list of items.
  2. Set dates to fix each item. And keep them.
  3. Clean thoroughly. First impressions count.

Handover day

Give the ownerKeep for yourself
Certificates and approvalsCopies of everything
Warranties and product manualsSigned handover form
Maintenance guideFinal photos of every room
Keys, codes and remotesRecord of what was handed over

After handover

  • Call the owner after a few weeks to check in.
  • Respond quickly to any defect reports.
  • Keep records for as long as you might be liable.

Why records matter

If a problem appears years later, dated photos, certificates and a signed handover form can show what was done and when.

General information only. Check your contract and state rules.

Frequently asked questions

What documents should a builder give at handover?

Typically certificates, warranties, product manuals, maintenance information and any approvals, as required by the contract and local rules.

How can I reduce defect claims?

Do a thorough pre-handover inspection with the owner and keep records of every stage of work.