Site safety for builders: SWMS and the basics that matter most

Last updated · By BuildersCPD editorial team

Builders have strong legal duties for site safety. Here are the basics, including when a Safe Work Method Statement is needed.

Short answer: builders must manage safety risks on site, and a Safe Work Method Statement (SWMS) is required before any high-risk construction work starts. Good safety is also good business: fewer injuries, fewer delays.

When a SWMS is needed

A SWMS is needed for high-risk construction work. Common examples include:

  • work where someone could fall more than 2 metres,
  • work on or near energised electrical installations,
  • trenches or excavations deeper than 1.5 metres,
  • work near traffic or mobile plant, and
  • demolition of load-bearing parts of a structure.

See Safe Work Australia's guidance for the full list.

What a good SWMS includes

PartExample
The taskInstalling roof sheeting
The hazardsFalls, sharp edges, weather
The controlsEdge protection, harness, safe access
How it is checkedSupervisor sign-off each morning

Everyday habits that save lives

  1. Site induction for everyone. Including subcontractors and visitors.
  2. Toolbox talks. Short, regular and about today's work.
  3. Keep access clear. Most trips and falls are preventable.
  4. Check scaffolding and edge protection. Before each use.
  5. Stop work when it is not safe. And make it normal to speak up.

Keep it real

A SWMS should match how the work is actually done. If the job changes, update it.

General information only. Check Safe Work Australia and your state regulator.

Frequently asked questions

When is a SWMS needed?

Before high-risk construction work starts, such as work where someone could fall more than 2 metres.

Who must follow the SWMS?

Everyone doing the high-risk work, and the work must stop if it is not being followed.

Related