Building in bushfire-prone areas: a builder's guide to BAL ratings
Last updated · By BuildersCPD editorial team
Building in a bushfire-prone area changes materials, details and costs. Here is a plain guide to BAL ratings for builders.
Short answer: a Bushfire Attack Level (BAL) rates a site's likely exposure to embers, radiant heat and flame, and it sets the construction requirements under AS 3959, the standard referenced by the National Construction Code. Higher BALs mean tougher materials and details, and higher costs.
The BAL levels
| BAL | What it means, in general terms |
|---|---|
| BAL-LOW | Very low risk, no special construction requirements |
| BAL-12.5 | Ember attack |
| BAL-19 | Increasing ember attack and burning debris |
| BAL-29 | Higher ember attack and radiant heat |
| BAL-40 | Much higher radiant heat and some flame contact |
| BAL-FZ | Flame zone, direct exposure to flames |
What changes as the BAL rises
- Ember screens and sealing gaps.
- Window glazing and frame materials.
- Decking, cladding and roofing materials.
- Subfloor enclosure and gutter guards.
Before you quote
- Get the BAL assessment and the planning conditions.
- Check the product specs against the BAL for every element.
- Price the details, not just the materials.
- Confirm with the certifier before ordering.
Common mistakes
- Using products that are not tested or rated for the BAL.
- Leaving gaps around penetrations and junctions.
- Late changes that undo bushfire details.
Keep learning
Bushfire construction is a strong CPD topic for builders working in regional and urban fringe areas.
General information only. Check AS 3959, the NCC and your state's planning rules.
Frequently asked questions
What is a BAL rating?
A Bushfire Attack Level that measures how much a building may be exposed to ember attack, radiant heat and flame, used to set construction requirements.
Who works out the BAL?
Usually a bushfire consultant or the planning process, before the design is finalised.
Related
- Cash flow for small building businesses: 7 practical habits Many building businesses fail from cash flow, not lack of work. Here are seven habits that keep money moving.
- Handover without headaches: a builder's final checklist A good handover reduces call-backs and disputes. Here is a checklist for the final weeks of a job.
- NSW builders' CPD: the 12-point rule explained NSW licensed builders and swimming pool builders need 12 CPD points a year. Here is how the points work and a simple plan to get there.
- ProCert announces BuildersCPD, opening early 2027 BuildersCPD is a new ProCert Australia brand for licensed builders, opening in the first quarter of 2027 with practical CPD and one clean record.
- Residential building contracts in NSW: a builder's checklist Most building disputes start with the contract. Here is a checklist to help NSW builders get residential contracts right from day one.
- Site safety for builders: SWMS and the basics that matter most Builders have strong legal duties for site safety. Here are the basics, including when a Safe Work Method Statement is needed.