Residential building contracts in NSW: a builder's checklist
Last updated · By BuildersCPD editorial team
Most building disputes start with the contract. Here is a checklist to help NSW builders get residential contracts right from day one.
Short answer: in NSW, residential building work above set values needs a written contract that meets the Home Building Act, home warranty insurance where required, limits on deposits, and written variations. Getting the contract right prevents most disputes.
The checklist
- Use a compliant written contract. It must include the details the Home Building Act requires.
- Check your licence covers the work. Including any specialist work.
- Arrange home warranty insurance before taking a deposit, where the job value requires it.
- Keep the deposit within the legal limit. Check NSW Fair Trading for the current rule.
- Set clear progress payments. Tie them to stages of work, not dates alone.
- Explain the cooling-off period. Owners usually have one after signing.
- Put every variation in writing. Signed by the owner before the work is done.
- Keep records. Plans, approvals, emails, photos and site diaries.
Variations done right
| Step | What to record |
|---|---|
| Owner asks for a change | Date and what was asked |
| You price it | Cost and effect on time |
| Owner agrees | Signature before you start |
| Work done | Photo and note in the site diary |
Warning signs
- Starting work before insurance is in place.
- Verbal variations.
- Progress payments that run ahead of the work done.
General information only, not legal advice. Check NSW Fair Trading for current thresholds and rules.
Frequently asked questions
Does a NSW home building job need a written contract?
Residential building work above a set value must have a written contract that meets the Home Building Act. Check NSW Fair Trading for the current thresholds.
When is home warranty insurance needed?
For residential building work above the threshold set by NSW law, before you take a deposit or start work.
Related
- Building in bushfire-prone areas: a builder's guide to BAL ratings Building in a bushfire-prone area changes materials, details and costs. Here is a plain guide to BAL ratings for builders.
- Cash flow for small building businesses: 7 practical habits Many building businesses fail from cash flow, not lack of work. Here are seven habits that keep money moving.
- Handover without headaches: a builder's final checklist A good handover reduces call-backs and disputes. Here is a checklist for the final weeks of a job.
- NSW builders' CPD: the 12-point rule explained NSW licensed builders and swimming pool builders need 12 CPD points a year. Here is how the points work and a simple plan to get there.
- ProCert announces BuildersCPD, opening early 2027 BuildersCPD is a new ProCert Australia brand for licensed builders, opening in the first quarter of 2027 with practical CPD and one clean record.
- Site safety for builders: SWMS and the basics that matter most Builders have strong legal duties for site safety. Here are the basics, including when a Safe Work Method Statement is needed.